哥斯达黎加

哥斯达黎加太阳能数据由当地太阳能安装专家提供。对您认为最好的答案,请点“赞” - 得票最高的答案将在最上方显示!若您对在哥斯达黎加安装太阳能系统有任何进一步的问题,您可以在下面提问,问题将会被发送给我们的太阳能专家。

您可以放大地图或输入地址来搜素附近所有的光伏公司。

Financial Incentives
- Feed-in tariffs and other government financial incentives

+16

Oct 9th 2013Today ICE, with support from MINAET, launched a significant new program to stimulate small-scale renewable energy generation. It is named the Net-metering Pilot Project.

This Project is extremely important because for the first time in Costa Rica’s history the utilities are inviting customers who invest in small-scale, distributed generation to connect their generation directly to the ICE distribution network. This is a tremendous step forward for Costa Rican consumers hoping to reduce their carbon footprint as well as take more control of their own energy generation and security. (To appreciate the magnitude of this change, consider that up till now ICE and distributors have penalized consumers who install solar panels and wind turbines and connect them to the grid).

All customers can participate, whether they are residential, commercial, industrial or agricultural sector consumers. Participants must add clean, renewable generation at their property, ie solar, wind, biomass, hydro, etc. The entire program is limited in size to 5 MW (ie the equivalent of 5 million Watts of capacity), and a significant portion of this capacity is reserved exclusively for residential consumer. This will prevent the potential that a handful of large industrials could oversubscribe the program.

ICE has indicated that once the program does approach its 5 MW capacity, that they expect to raise the capacity ceiling rather than deny further participants entry. However, this is not certain, and meanwhile it is a ‘first come – first served’ program.

+5

Jun 25th 2014For commercial and industry we offer BOT ( Build, Operate and Transfer) Systems based on a PPA ( power purchase agreement)!
From 12 to 25 years!

Return on Investment
- What sort of return on investment can homeowners installing a solar power system expect

+13

Oct 9th 2013The net-metering pilot project offers fifteen year (15) contracts, which ensures that participants have time to recoup their investments.

+2

Jun 25th 2014Costa Rica
For Residential 4 - 6 years
For Commercial  2 - 5 years
For Industrial  6 - 8 years ( systems with mega batteries are guaranteed for 20 years)

Recommended Sites
- Useful non-commercial solar websites for homeowners and businesses that want to learn more

+0

Oct 9th 2013The World Business Council for Sustainable Development (WBCSD)
www.wbcsd.org

The Solar and Wind Energy Resource Assessment (SWERA)
http://swera.unep.net/

The American Council on Renewable Energy (ACORE)
www.acore.org

Solar Suitability
- How suitable is the climate in the country for solar electricity

+6

Jun 25th 2014Central America has dopple radiation like Germany!  about 1900 KWH/m2/year

Planning Requirements
- Government regulations relating to installations of solar power systems on homes and commercial buildings

+5

Jun 25th 2014We have a pilot plan that allows you to produce the energy you use, not more! The exchange is 1KWH for 1KWH

Grid Connection
- Overview of the process to get a rooftop solar power system connected to the grid

+4

Jun 25th 20141) Client, send required information to size the system
2) Client deposit $ % of the price
3) Inti Tech order, send  and receive equipment
4) Inti Tech install
5) Inti Tech  file application for grid connection

Does the new program allow for commercial installations and if so is there a limit to the size of the installation?

Dec 7th 2016 by devonstrauss@gmail.com

+1

Dec 8th 2016Yes, commercial installations are allowed for up to one megawatt.

What is the status of grid-tied systems in Costa Rica. It's my understanding that the program has ended and no new one has been approved. Do you have any information?

+3

Aug 11th 2016Thanks for your inquiry. A new grid-tie program has been established as of April 2016. However, the new terms allow the grid-tie owner to sell the energy he produces to the energy provider at a discounted price, not the full price, per kWh. It still is a good deal for the grid-tie owner, however.

cuales son los costos actuales de instalar un sistema de paneles en una casa de una area de 70 mts cuadrados

+3

Jun 25th 2014For 72.8 m/2 we can install 56 Solar Frontier CIS 170 Watt panels 9.52 KWp installed with a 10 KW SMA inverter, cost is $ 20.000US turn key!
from 2 - 150 KWp  the price goes from $3 - $ 1.8 per KWp installed!

向专家提问

姓名: 电邮: 5+6=

该网页提供的建议和回答由第三方提交。网页上的信息未被易恩孚赞同,也不代表易恩孚的观点。由读者听取该网页提供的任何建议而产生的相关责任,易恩孚一律不予承担。